The tools menu has comments and track changes.
Comments can be added
- Add text into the blank comment (edit as required)
- Click the plus icon to add the comment
- Add a due date; if required
- Assign a collaborator; if required
- Click the check mark to change its status from open to closed (or back again)
Track changes work this way:
- Turn track change on
- Edit your changes and they are added to a comment
- Click the plus icon and each individual change is split into a seperate comment
- each tracked change can be marked as accepted or rejected
Comments
Track changes
- On the tools menu, click the track changes icon to activiate
- Add. modify or delete text; as required, and each change will be added to the active comment
- Click the + icon at any time, and all recorded changes will be split into individual comments
- A collaborator can then accept or reject each change